everybody who likes the idea of a base without sufficient flights out of the latter :
the classic crew is basically facing exactly that problem : soon all the long range flights will be done by the -400 ( I am already paxing alot at the moment). that means headland regurlarly up to the maximum of 12 days, followed by the MINIMUM off days required. go figure

