PPRuNe Forums - View Single Post - Saving money and improving operational capability
Old 2nd Dec 2007, 13:17
  #4 (permalink)  
Role1a
 
Join Date: Jun 2005
Location: UK
Posts: 94
Likes: 0
Received 0 Likes on 0 Posts
Story has it that the army changed the criteria for lift capability which excluded the UH60 from being the Wessex/Puma replacement.
Why:
Because the AAC wanted AH and someone realised that a UH60 could easily be converted to a gunship/AH and they would lose the justification.
Result: Long delay in Wessex and Puma replacement.
All rumour of course!!
R1a

Last edited by Role1a; 2nd Dec 2007 at 19:16.
Role1a is offline