PPRuNe Forums - View Single Post - Origin of "Scheduled" Performance
View Single Post
Old 1st Dec 2007, 21:10
  #3 (permalink)  
Wind Up Turn
 
Join Date: Sep 2003
Location: UK
Age: 59
Posts: 28
Likes: 0
Received 0 Likes on 0 Posts
Many thanks John.

I think I've seen "scheduled" substituted by "regulated" performance in some discussions. This, as you've suggested, would imply a set of conditions which, if met, have been shown by some regulatory or certification authority to provide the required level of probability of a safe operation, be it a take-off, landing or whatever.

I'm fairly new to the field of aircraft performance and this was one of those innocent "why's that then?" questions that didn't seem to have an answer that I could find written down.

Thanks again

WUT
Wind Up Turn is offline