PPRuNe Forums - View Single Post - MoD must find over £1bn in savings
View Single Post
Old 30th Nov 2007, 11:41
  #16 (permalink)  
Roland Pulfrew
 
Join Date: Aug 1998
Location: England
Posts: 1,930
Received 7 Likes on 4 Posts
But the GR9 is being extended.
Wader. Do you imply that we have to lose 2 GR4 sqns because the GR9 is extended?

Or are we extending the GR9s because their replacement isn't going to be ready on time?

Either way the potential to lose 2 GR4 sqns is a cut in capability not a savings measure.
Roland Pulfrew is offline