PPRuNe Forums - View Single Post - New CHC S-92
Thread: New CHC S-92
View Single Post
Old 14th November 2007 | 10:35
  #110 (permalink)  
[email protected]
25 Anniversary
 
Joined: Apr 2000
: ATP+Mil
Posts: 10,959
Likes: 1,814
From: EGDC
Is this alleged 3 hour run dry time at min pitch on the ground or at cruise speed?

Maybe Sikorsky would like to look at the Emergency Lubrication System bolted on to the Sea King after many years of MRGB oil being dumped over the side.
crab@SAAvn.co.uk is offline  
Reply