Question I have is how did BHD do so far with the turn-arounds etc.?
Worked well, 25mins was met. New equipment (Air stairs, baggage trolleys, belt loaders, tugs, etc) were provided for ryanair, and 4 men per A/C. There was 2x 737-800 and 1x A320 in at the same time, which seems an unusual sight now, but I wonder what the future holds.