Doing unsheduled overtime to solve a crisis or controlled amounts of scheduled overtime is one thing. However I know of one UK operator where engineers have been allowed to roster themselves on O/T for over 20 days in a row.
There has to be a limit somewhere and the CAA needs to take more interest in the subject.
What is the point of all the human factors training if some of it's basic concepts are ignored.