When assigning climb and descent at once to two aircraft dircetly over and below eachother, I will always teel them about the other for this reason. I am aware that in some areas in my Centre, the controllers assign 2000ft between in this situation. When you are talking 500ft, an RA is going to occur with any rate of closure anyway. No cure for stupidity.