Not completely correct... The checklist was never completed after the power lever was retarded,and the prop rpm was inside limits (controllable).
The next step is to feather the prop, but keep it running - in case you for some reason need the engine later on... Don`t know the SAS procedures regarding this though, so I could be mistaken