PPRuNe Forums - View Single Post - Pilot Academy Europe -- CAA
View Single Post
Old 6th September 2007 | 15:35
  #3 (permalink)  
BClouds
 
Joined: Aug 2007
Posts: 70
Likes: 0
From: California
Well i guess i got my answer.
Here is a clear message i received from the head of training:


"The only difference is the layout of the course both programs is ab-initio.
***The Ab-initio integrated program integrates the theory through out the duration of the course and requires therefore more theory and more dual flight instruction.

***The PPP is a modular based program where each module is optimized so to be completed in less time and at a reduced cost. Both programs gives you the same licenses and more or less the same amount of flight hours except that the PPP includes also a Flight Instructor license."


The Ab-initio is done with Aeromadrid, so let's forget about it.
I am hesitating with the PPP.

Do you recommend me going via the PPP?
Or should I forget about that and stick to a school proposing an integrated ATPL program?



BeautifulClouds
BClouds is offline