PPRuNe Forums - View Single Post - A400M will not make 2009
View Single Post
Old 29th August 2007 | 07:11
  #20 (permalink)  
Saintsman
20 Anniversary
 
Joined: Jan 2003
Posts: 906
Likes: 102
From: Southampton
Whilst the performance of the A400M is the main consideration, also in the equation is the maintenance and support costs. The A400M will require very little maintenance with the first 'heavy' check at the two year point only taking about a week. The running costs will be considerably less than a C130plus it also gives better availability and therefore a smaller fleet is required.
Saintsman is offline  
Reply