Exrigger: I understand all that was said in the posting, which for the record happens to be the answer to a PQ that Tapper's Dad's MP raised. I also know that a sample analysis on similar pipes was carried out between July 2005 and April 2007 on MR2 a/c returned to BAE on MRA programme. (Obtained under FOI)
TD simply wants to know if the maitenance/lifing progaramme has been defined and when will it swing into action? As things stand at present we could have Nimrods flying around with defective piping.
When did Noah build the Ark ------ before the flood.
DV