RECOMMENDATIONS made after the XV227 incident in 22 Nov 04
were that
The SCP duct is with replaced with new manufacture items on a fleet-wide basis as soon as possible.
A hot air leak warning system is introduced for the ruptured duct and cross-air bleed ducts.
Does anyone know if this lifing / maintenance/ replacement policy has been implemented.And if so when was it implemented.