CAP493
The fact that the rest of Luton and South Beds ground to a halt is nothing to do with LTN or LLAO but
So they could not have planned that a tunnel that is taking water from both sides of the road AND a large taxiway, might fill up?
So they could not have planned to have suitable channels to discharge the taxiway water elsewhere?
So they could not have planned to put suitable pumps into the tunnel infrastructure to handle peak volumes of water?
So a group of civil servants did not ensure that a commercial organisation met the highest standards of construction?
As a result of their failure, they have lost money and reputation.
OK - tell me what I missed?