PPRuNe Forums - View Single Post - Qantas Maintenance Story On Ch.7
View Single Post
Old 19th Jul 2007, 05:32
  #72 (permalink)  
Bolty McBolt
 
Join Date: Jul 2005
Location: OZ
Posts: 580
Likes: 0
Received 0 Likes on 0 Posts
Pure genius

If only I had known I could fix emergency track lighting with a stapler !! pure genius.

If that defect occurs it quite often means emptying the adjacent zone of pax.
That means off loading 50 plus people

Perhaps tech services can get this repair put in the manual as a temp wiring repair for future drama as it looks like the staples were fitted for almost 12 months.

SIAEC is ahead of its time and we should not be criticizing but embracing them or I should be writing PR for D Cox

Bolty McBolt is offline