On the ... CRJ the APU generator is used to provide redundancy in case of failure of an engine driven generator
Actually, the APU is on the MMEL as a category C item (10 days), and is not taken credit for in safety analyses, for the same reason as mentioned above (too much impact on dispatch reliability)