PPRuNe Forums - View Single Post - Instrument Approach Question
View Single Post
Old 14th Jun 2007, 17:44
  #3 (permalink)  
Dr Eckener
 
Join Date: Oct 2005
Location: uk
Posts: 201
Likes: 0
Received 0 Likes on 0 Posts
UK AIP ENR 1-5-4 defines established as half scale for ILS, VOR and 5 degrees for NDB. Outside these limits means you are venturing outside the protected area, and terrain separation reduces, eventually to zero.

You need to look at how an approach is constructed in order to show this. If they have studied ATPL exams, then refer them to their course notes. I would generally say (if you are teaching IR) that the discussion is beyond the scope of the flying element of the course, as it was covered during ATPL's.

Pans-Ops is the place to go if you really want to get something in black and white, or your company ops manual should cover it if you have one.

Hope this helps.
Dr Eckener is offline