PPRuNe Forums - View Single Post - Marine One Woes
Thread: Marine One Woes
View Single Post
Old 25th May 2007 | 21:53
  #90 (permalink)  
waspy77
 
Joined: Jul 2006
Posts: 55
Likes: 0
From: UK
"From what I can take from all this; The US is buying a helo that all of a sudden didn't meet it's spec for carrying the President. Therefore, the US will now pay to have the helo re-bladed, stretched, re-engined, new rotor(s) and all at taxpayer expense?"

I don't take that at all.
Delays due to system integration complexity, an increase in the required capability of the Increment 2 aircraft, an increase in cost because it is now cheaper to build 5 new Increment 2 airframes than re-engineer the 5 Increment 1 airframes. All these I have read about.

At the time of the VXX announcement, Navy assistant secretary for research, development and acquisition John Young said both the US101 and VH-92 would need rotor and drivetrain improvements to meet VXX Increment II requirements. - AHS International

So neither of the base aircraft could meet the Increment 2 requirements.
waspy77 is offline  
Reply