PPRuNe Forums - View Single Post - JPA- 'Positive' Audit?
View Single Post
Old 13th March 2007 | 08:38
  #14 (permalink)  
Backwards PLT
 
Joined: Aug 2006
Posts: 250
Likes: 0
From: Belgium
The receipt situation, at least for me has gone like this:

Initially "receipt for everything". This was recognised as being unworkable/stupid so was changed to "No receipts for stuff under £5". This has now been changed to "receipt for everything, but if you cant get one then self certify". This seems very sensible and note the £5 thing no longer exists.

I got the impression that this was to be the same everywhere, but there do seem to be a lot of local procedures/local forms popping up.
Backwards PLT is offline  
Reply