Hi all, I've just downloaded RHC's operating costs for the R44 Clipper II. I was wondering if this can be converted from US$ to AU$ or is the pricing structure different in Aus? Just looking to acquire a Clipper II so need to do the sums on full operating costs.
Thanks in advance.
Masteroff