Typical duration of the burn-in period
Hello everyone
I am a student working on the ATC equipment reliability and was wondering what is the typical duration of the burn-in period with ATC equipment and system. I found one IEEE reference stating 30-90 days. Is this a reasonable estimate?
Many thanks,
Branka