PPRuNe Forums - View Single Post - E-3D Storm Damage
View Single Post
Old 24th January 2007 | 20:51
  #60 (permalink)  
Exrigger
20 Countries Visited
15 Anniversary
Veteran: Air Force
 
Joined: Dec 2006
Posts: 492
Likes: 27
From: Lincoln
Winco

I mentioned in #5 that Northrop Grumman are now the Design Authority, as well as prime contractor for the Sentry support. The decision will be, as I understand it, either the team at Waddington or RSS (or whatever they are called nowadays) from St Athan. The last repair for spar corrosion was carried out by a St Athan team. HTH
Exrigger is offline  
Reply