PPRuNe Forums - View Single Post - E-3D Storm Damage
View Single Post
Old 24th Jan 2007, 20:51
  #60 (permalink)  
Exrigger
 
Join Date: Dec 2006
Location: Lincoln
Age: 72
Posts: 481
Received 8 Likes on 4 Posts
Winco

I mentioned in #5 that Northrop Grumman are now the Design Authority, as well as prime contractor for the Sentry support. The decision will be, as I understand it, either the team at Waddington or RSS (or whatever they are called nowadays) from St Athan. The last repair for spar corrosion was carried out by a St Athan team. HTH
Exrigger is offline