PPRuNe Forums - View Single Post - Mishap to XL445: 15th June 1983
View Single Post
Old 18th Dec 2006, 21:58
  #4 (permalink)  
ZH875
 
Join Date: Apr 2003
Location: Lincolnshire
Age: 64
Posts: 2,279
Received 37 Likes on 15 Posts
The fuel dump was fitted in place of the VCCP from the old ECM kit, IIRC the mains fed the bomb bay tanks which then fed the dump system.

Awaiting correction by the fuel soaked sooties.

Picture shows the fuel dump pipe at the rear starboard of the aircraft, just below where the VCCP was fitted.

© BAE Systems. Courtesy Ian Lowe at Woodford.

Last edited by ZH875; 18th Dec 2006 at 22:07. Reason: Added Picture
ZH875 is online now