We've suddenly been lumbered with having to give holding point designation with all line up instructions; MATS Pt 1 says you only need it with intermediate departures not full lengths; in my opinion it adds unnecessary RTF loading to an already busy frequency in addition to having to try to get CSD right for the LCE.