Originally Posted by VuctoredThrest
. . . could move the OEU to be located with the manufacturer and cut out the middle man.
If you take that route, some cost-saving zealot will try and merge the OEU task onto the contractor and I do not think that is a good idea. Moreover, the military evaluation unit must maintain independence, a physical distance from the platform contractor goes a long way to achieving this situation.
lm