PPRuNe Forums - View Single Post - Aircraft Down
Thread: Aircraft Down
View Single Post
Old 2nd Sep 2006, 12:23
  #14 (permalink)  
Trash Hauler
 
Join Date: Apr 2000
Location: Oz
Posts: 186
Likes: 0
Received 0 Likes on 0 Posts
Noted on the GFA website an AD for inspection of exhaust system. AD issued on 18 Jul 06 and required to be incorporated within 10 engine hours. Affected engine is Rotax 914 F2/S 1. Are these the only engines fitted or do they also have Porsche as per previous reference?

TH

http://www.gfa.org.au/Docs/ADs/GFA%2...0Issue%201.pdf

Last edited by Trash Hauler; 2nd Sep 2006 at 12:24. Reason: fix typo
Trash Hauler is offline