as long as my big ol' a-hole points to the ground there is no way any hc-rpt operator can get an aircraft of that complexity up, on the aoc and running by november. Even the captain's of dodge, njs, took them 5 months and only by the skin of their hairy chin chins. What about maintenance, have they a hangar capable of taking it, no operators on the perth airfield would have coverage and only the old an guys would have coverage.
6 to 8 months at the very least.