I'd suggest reaction time issues might be a factor - typically when a failure occurs with AP on the time assumed for the crew to recognise the failure and react to it is assumed to be longer than for hands-on flying. If you had to assume, say, a 4 second dwell at V1 instead of 2 seconds, for the rejection case, the distance penalties might be considerable.