Now let me see if I've got this right.
Given the length of this contract, it must mainly be for the C4/C5s.
The RAF website says that we have 25 of those and that they were new in 1998.
....... and they plan to be working on a minimum of 7 aircraft at a time? That's over 28% of the fleet!