PPRuNe Forums - View Single Post - NEMP protection - ACJ and BBJ Considerations
Thread
:
NEMP protection - ACJ and BBJ Considerations
View Single Post
30th May 2006 | 05:20
#
26
(
permalink
)
Airbus Instructor
Joined:
May 2006
Posts:
3
Likes:
0
From:
Bahrain
A320 FBW Systems
Gentlemen,
Find below some information about the A320 FBW systems.
The RAT can be extended by two ways:
1. Automatically; in case of loss of both AC BUSSES with A/C in-flight and speed > 100 KTS, where the EMER GEN will automatically activate to supply the ESS busses and save battery life.
2. Manually, by pushing one of two push buttons, (
RAT MAN ON)
on HYD panel OR (
MAN ON)
on the EMER ELEC panel, the last one will not only extend the RAT, but also will activate the emergency generator to supply the ESSENTIAL Busses; the two push buttons will supply BATT power to two different solenoids that will unlock the RAT uplock and allow a spring to extend the RAT.
3. The logic on the A330/A340 is almost similar; the only Airbus that uses a cable to extend the RAT is the A300 and the A310.
The A/C flight control system is totally hydraulically operated, so HYD pressure should be available to have control.
In case of total ELEC failure provided HYD PRESS is available, the A/C can be controlled using the STAB trim wheel for PITCH control and using the rudder pedals for YAW/ROLL control. Now in the configuration, the A/C is fully controllable and can be maneuvered for landing.
Landing gear is controlled electrically, but a mechanical backup is provided to mechanically unlock the Doors/Gears uplocks and take them down.
Wheel brakes are electrically controlled, but a manual backup is provided as well, (of course HYD should be available)
Sorry for the long answer but I hope this gives better understanding of the A320 System.
Airbus Instructor
View Public Profile
Find More Posts by Airbus Instructor