We need to start cutting steel and doing the hundreds/thousands of other things that need to be done - much of this will use the same technology as the Type 45 Destroyer.
Surely getting the construction of the hull modules should start NOW, why do the Government insist that every decision about the outfitting (CTOL vs STOVL for instance) before work can start?