PPRuNe Forums - View Single Post - Engine Changes
Thread: Engine Changes
View Single Post
Old 6th Jan 2006, 19:04
  #23 (permalink)  
numbskull
 
Join Date: Feb 2005
Location: Sydney
Posts: 258
Likes: 0
Received 0 Likes on 0 Posts
Re: Engine Changes

We would usually do an engine change on 747 or 767 in a 12 hr shift and leave the run for the oncoming shift. sometimes takes longer if there is problems. That includes inhibiting the old engine,changing IDG,Hyd pump and nose cowl. Thats with a crew of 6 or 7 and an overhead crane. A bit slower with a mobile crane or bootstrap.

Could be done quicker but there is no incentive so why "bust a gut"
numbskull is offline