The last gasp of the channex A300 draws nigh. But when, "aye there the rub" Maybe mid Feb maybe the end of March but if they can sell the jet then ASAP to fund intro of the "new" boing.
The crews? The f/e and grd eng are down the road! Loyalty dont talk to me about loyalty, here I am brain the size of a planet and all I get offered is diddly. Thanks. I would have left before except that people I actually work at the coal-face with are as nice a bunch as you could want.