PPRuNe Forums - View Single Post - Turbines/Pistons in GA
View Single Post
Old 9th Dec 2005, 07:40
  #4 (permalink)  
BackdoorBandit
 
Join Date: May 2002
Location: Oz
Posts: 78
Likes: 0
Received 0 Likes on 0 Posts
What is required to replace the Chieftain/Titan role is an a/c with the following attributes:-

Single turbine engine
10 seat
Retractable
Unpressurised
200+ Kts

Only then will there be a cost effective viable replacement.
BackdoorBandit is offline