Kontrolore (and others),
You can always clam some type of question for the structural capability for the a/c taking in mind existence of cracks and their control through appropriate set of inspection intervals.
But still the bird flies, so, I assume you can do the same for this type of electrical failure.
Did I draw here a line to long, perhaps?
Anyway PIC makes the decision with full responsibility and I guess (and hope) it is a valid one.
To see all the systems fail (as someone mentioned 5 generators) it would be a hell of a case for R&M to look into.
Cheers,