Just read through the airport document. There are 4 runway options with the airport pushing for a new runway 950m south of the existing one. Road passengers will disembark at a reception centre in what is now the mid term car park and then either head for the existing terminal or the new terminal via a tunnel under the runway using a tracked transit system. The transit system will also link up with the airport's railway station.
Last edited by LTNman; 25th October 2005 at 17:46.