Visual...
Thank you for the post. I'm dealing with class A performance, and have the paragraphs from subpart G (amd.9) referenced above beside me.
Can I infer that you mean there is a difference between 2.1 and 2.2 in AMC OPS 1.495(d)(1) & (e)(1)?
That the obstacles/external references mentioned in 2.1 lie outside the 300m (600m w/ bank) area, while the obstacles and/or ground reference points in 2.2 are inside the 300/600 or .125D splay area?
Or, is 2.2 just a clarification of 2.1? The way I'm understanding it, 2.2 just expands the text of 2.1.
That is the essence of my question.