TNS 40
Javelin
Check the TNS - it tells you to do the inspection in-situ. You only need to remove the wires if they fail because of corrosion or cracking. Make certain that the wires are correctly tensioned and then do a test flight to make sure that they do not vibrate in flight. I am told that it takes about a day to do the whole job including the test flight, provided that all the wires pass the inspection.