795 hrs. 90% logging with a little seismic and some fires thrown in for good measure. 2 on 2 off with an additional 3 months offin the winter to keep the tan in good shape.Sk61/AS350/Bh214
[This message has been edited by mediummetal (edited 01 April 2001).]