PPRuNe Forums - View Single Post - North Sea Jigsaw
View Single Post
Old 24th Jun 2005, 14:20
  #336 (permalink)  
Night Watchman
 
Join Date: May 2004
Location: Nowhere Special
Posts: 127
Likes: 0
Received 0 Likes on 0 Posts
Jbrereton

Yes, you’re right the Bond guys are doing line shifts at Aberdeen which will of course help to keep them current for line flying which is just as well really if the rumours are true.

Unfortunately, it means that they can go 6 weeks without winch training before going back offshore to do SAR and potentially go straight into a rescue situation. Glad I’m not going down the wire!

Your point about who would rescue the SAR aircraft while training is interesting but flawed. You obviously are unaware of what jigsaw was originally about. The whole concept of jigsaw was to provide dedicated SAR offshore for crew change aircraft. Therefore the SAR aircraft would be there for passenger safety only. But if the SAR aircraft is doing shuttling then it’s not dedicated SAR and the passengers are not covered in the event of a ditching of the shuttle aircraft. This was not what the jigsaw concept was originally about. Nor was this how it was sold to the workforce.

Another point of Jigsaw was to do away with individual standby boats and have a larger regional vessel which may not be in the immediate vicinity if the SAR/shuttle aircraft ditches, again delaying any potential rescue.

So we’re left with the other aircraft but who’s to say it’s not doing the Shetland Island air ambulance service at the time. So the ‘old slow’ Coastguard S61’s you slander may be the only thing left.

A great idea has been cut and slashed by the accountants and the offshore workforce is being left with a cheap alternative.

And why is it whenever anyone raises a question about Jigsaw on this thread you accuse them of mischief. Surely this forum is here to discuss these sorts of issues or are you some sort of Bond spin doctor?
Night Watchman is offline