PPRuNe Forums - View Single Post - Next questions
Thread: Next questions
View Single Post
Old 22nd August 2001 | 02:24
  #10 (permalink)  
gas path

Usual disclaimers apply!
 
Joined: Nov 1999
Posts: 843
Likes: 0
From: EGGW
Post

(1)HIRF means High Intensity Radiated Fields.

(2)HIRF/Lightning tasks in this section (AMM TASK 05-51-19-210-801 p201) are for scheduled maintenance.

(3)The purpose of the HIRF/Lightning inspections is to inspect wire bundle connectors for problems.

(4)The purpose of the HIRF/Lightning tasks is not to look along the lengths of the wire bundles.

(a) If you notice damage along the length of a wire bundle, make a note of the damage and do the necessary repairs after you complete the HIRF/Lightning inspection tasks.

(5)The inspections are applicable to the critical and essential systems and LRUs

NOTE:The emphasis of the HIRF/Lightning inspections is in the areas outside of the pressure vessel and in the Main Equipment Center. These areas are where HIRF/Lightning protection for systems is most important. If HIRF/Lightning protection problems exist, these are the areas where HIRF/Lightning protection will most likely be compromised. There may be systems listed in the following list which may not be inspected in any of the HIRF/Lightning inspections. This is because such systems may not have wire bundle connectors outside of the pressure vessel or in the Main Equipment Center.

Extract from AMM for 777
Broken down into Critical and Essential tasks

[ 21 August 2001: Message edited by: gas path ]
gas path is offline