JAA PPL/IR
There's an organisation in the back of PILOT magazine advertising a modular JAA SE IR that can be done start to finish in 2-3 weeks (assuming you have the right medical and have passed the theory). Is this a realistic timeframe ? I'm no expert at all but would have assumed it to take longer than 2 weeks ?