PPRuNe Forums - View Single Post - HMX/Marine 1 contract due..
View Single Post
Old 28th Jan 2005, 21:10
  #7 (permalink)  
Jackonicko
 
Join Date: Jul 2000
Location: Just behind the back of beyond....
Posts: 4,191
Received 6 Likes on 4 Posts
"Lockheed Team Wins Presidential Chopper
------------------------------------------------------------------------
WASHINGTON (Reuters) - In a surprise move, the U.S. Navy has chosen a trans-Atlantic team led by Lockheed Martin Corp. (LMT.N: Quote, Profile, Research) to build a new U.S. presidential helicopter fleet, a congressional source familiar with the decision said on Friday.

The decision was a stunning setback for Connecticut-based United Technologies Corp.'s (UTX.N: Quote, Profile, Research) Sikorsky Aircraft unit -- which for nearly 50 years has built and maintained the green and white "Marine One" helicopters that fly the president."

U.S. Department of Defense
Office of the Assistant Secretary of Defense (Public Affairs)
News Release
On the Web:
http://www.defenselink.mil/releases/...0128-2037.html
Media contact: +1 (703) 697-5131 Public contact:
http://www.dod.mil/faq/comment.html
or +1 (703) 428-0711
------------------------------------------------------------------------
_ No. 094-05
IMMEDIATE RELEASE January 28, 2005
------------------------------------------------------------------------
Lockheed Martin to Build New Presidential Helicopter
___________ The Department of Defense announced today that the team led by Lockheed Martin Systems Integration, Owego, N.Y., has been selected to build the new presidential helicopter (VXX) based on its U.S. 101 medium lift helicopter.
_
___________ This $1.7 billion, cost plus award fee contract will launch the VXX program’s system development and demonstration phase during which the program will integrate a “system of systems” with a modern, in-production aircraft to provide the president with safe and reliable helicopter transportation.
_
___________ “Today’s announcement is a significant milestone that caps an exhaustive and deliberative source selection process that carefully followed the Federal Acquisition Regulations,” said John Young, assistant secretary of the Navy for research, development and acquisition._ “The determined effort, long hours and hard work by both the VXX government team and the two industry teams will ensure a high level of quality and safety for future presidents, as well as a timely, efficient and effective program execution.”_
_
___________ “This decision truly reflects the best value and capability for the American taxpayer who is funding it, the Marines who will operate it and the future presidents who will fly in it,” Young added.
_
___________ The fleet of helicopters that currently supports the presidential mission includes 30-year old aircraft that were designed in the 1960’s, fielded in the 1970’s and no longer has the growth capability to incorporate the equipment necessary to provide suitable presidential support in the post 9-11 environment.
_
___________ “Under this replacement program, with its technology and performance improvements, a single platform will provide better savings in total ownership costs, engineering, maintenance and logistical support over the lifetime of the program,” Young said.__ “The president needs a more survivable helicopter while the nation engages in the Global War on Terrorism, and we are committed to providing it as soon as possible.”
_
___________ The original Presidential Helicopter Replacement Program of record proposed an initial operating capability in 2013._ The VXX program was accelerated in 2003 with a currently planned IOC in fiscal year 2009.__
_
___________ For more information, please contact Navy Public Affairs at (703) 697-5342.


------------------------------------------------------------------------
Jackonicko is offline