So guys ... sorry for being so thick, but is this correct then ... ?
If not on track by the 1/4 way point = adjust with double track error and at 1/2 way point make a correction.
If not on track at the 1/2 way point = tripple track error - make correction at 3/4 way point.
If not on track at 3/4 way point = add TE + CA to get to the destination.
????????
Am I correct here?
Would I be able to navigate accurately using this method ?
Thanks and sorry again .... to used to track crawling!!
ABO