You're right HEEA . Apparently it was a disaster with some major documentation missing, phones that wouldn't work , people turning up to do sectors that they won't be doing at NERC . Need I go on?? The NTT team were also put under pressure to sign off the training they had carried out. with the exception of the Clacton sector, they REFUSED to do so. There were lots of managers walking around with very red faces or was it faeces. Never mind it'll be all over Airway as a resounding success.