PPRuNe Forums - View Single Post - Canadian registered a/c loadsheets
View Single Post
Old 19th November 2004 | 17:51
  #2 (permalink)  
Mark McG
 
Joined: Apr 2002
Posts: 51
Likes: 0
From: EGPF
Used to do this for Canada 3000 before they went bust.

It took a while for the computerised loadhseets to get approved.
The crew were still required to do a manual loadhseet based on the manual load detail form info that was provided.

A copy of the Manual Loadhseet, Computerised Loadsheet and Manual Load Detail From had to be submitted for every flight during the trial period to the airline/Transport Canada for evaluation. Once they were eventually satisfied then the computerised loadhseets were approved. As I say it took a while for the approval - somewhere between 6 months and a year if I remember right.

It's back to the old fashioned way at the moment of manual load detail forms.
Mark McG is offline