Was this that M&B question?
Empty mass of a/c is A
Operational items (including crew standard mass of B) is C.
MZFM is D.
Max traffic load is?
Assuming 'operational items' is the variable load, and assuming B figure is included in C, then
MZFM - BEM+VL = Traffic Load.