Methinks the SRA have got this wrong. The regular Commuter trains are not designed to cope with the luggage of the airline passengers, especially those arriving from long haul!
If the service is taking too much capacity out of the system at peak times, then reduce it back to 3 an hour, but to finish it completely is a retrograde step.