New development work for LTN

Interesting year ahead with the following confirmed building work taking place at Luton. All work to be finished by June 2005 apart from the first 2 items.

Work starts on dual carriageway into the airport
Work starts on M1 being widened to 4 lanes
2 new piers serving the north and east apron
2 new stands between stand 9L and stand 40
New apron for Harrods
Easyjet tent to be moved to the cargo apron to free up 2 stands on the eastern apron
New large 1st floor security hall above the existing arrivals area to be built
Terminal to get its first excalators.
The opening up of 9000sqm of new airside lounge above the check-in desks.
Existing pier to be connected to the new airside lounge
More shops to open
New immigration hall to be built to the north of the new terminal
New larger International baggage reclaim hall
New larger domestic baggage reclaim hall
Passenger set down area to be modified to allow improved circulation
New hangar for Harrods