PPRuNe Forums - View Single Post - Preliminary report VH TNP
View Single Post
Old 6th September 2004 | 02:38
  #8 (permalink)  
NAMPS
 
Joined: Jan 2004
Posts: 302
Likes: 0
From: WX at our destination is 32 deg with some bkn cld, but we'll try to have them fixed before we arrive
Does anyone know of a parallel track can be set up on an IFR approach?
Not the one TNP was conducting.
NAMPS is offline